Week Commencing 16th March
The week begins with lots of Talks of some crazy Lockdown meaning a halt to daily life. But I tried to finalise on the two bedrooms I had been working on.
Plus the floor tiling in our Utility Room, with the final positioning of the Washing Machine, Dishwasher and Tumble Dryer. Also to include the base and wall units.
This week we also started to have the external walls rendered.