Day Six – Ten – 4th – 8th November (week 2)
Building Regulation Requirement:
Ground Floor wall construction.
- 102.5mm Facing Brick work
- 100mm Cavity with GA4000 Insulation or similar
- 100mm 7N Aerated Blockwork
Blockwork to GL
Dave and Steve carried out the next stage of construction …
That is to construct the block-work from top of foundations up to GL this will give a platform for the next stage of the build the facing brick work up to DPC. Then they went from Ground Level to DPC (damp proof course) with Facing Brickwork this is because we are having weatherboarding so from GL (ground level) to DPC this face will be visible.