Day Five – 2nd November
A group of guys turned up with a prepared cement mixer to fill the foundation trenches with concrete.
The use a pipe and pour it straight in. First they started with the upper patio filling the 1.25m trenches and then with the lower foundation section all filled to the same depth, One guy goes round to ensure they are levelled out with out any massive imperfections to ensure the top of the foundations are level this ensures a good starting point for the blockwork to be formed
.